Skip to content

Modular buildings

Modular buildings

Connected spaces for offices and everyday team facilities.

Modular buildings — Mobilbox example

Photographs from the Mobilbox group archive; specifications are confirmed in your quotation.

A solution for your project

Combine modules around the required rooms and circulation. Share a sketch, expected occupancy and site information to discuss layouts, utilities, foundations and installation. Technical details and local project requirements need to be confirmed before work starts. The proposal will specify equipment, delivery and assembly.

Request a tailored quotation

Include the site address, intended use, number of users and rental period or purchase preference. Please send access photographs and a list of required equipment.

Rooms designed as one working environment

Connected modules can provide separate offices, meeting rooms, welfare areas and circulation spaces. A useful starting point is a room list with the expected occupancy and daily flow between spaces.

Prepare a layout brief

  • Define the purpose and expected occupancy of each room.
  • Identify entrances, corridors and accessible routes.
  • List furniture, utility connections and technical equipment.
  • Note future changes or phased installation requirements.

From sketch to project proposal

Share a simple drawing, site information and your target period. The layout can then be discussed alongside the structure, foundation, utility routes and assembly sequence. Photographs show possibilities, not a fixed package or a promise that every arrangement is available.

Coordinate the site work

Clarify who prepares the base and connections, who manages access and unloading, and how the assembled spaces will be handed over. Local approval and technical requirements must be checked for the specific project before installation.

Frequently asked questions

Can modules form a multi-storey building?

Some modular configurations are multi-storey. Suitability depends on the chosen system and project design; it must be confirmed technically for your site.

Can rooms be rearranged later?

Describe future needs early. Changes depend on module connections, services and the original design, so they should not be assumed without assessment.

Explore other solutions